This case study highlights the key advantages of real-time downhole monitoring. It demonstrates how continuous data acquisition and instant feedback lead to improved well performance, reduced downtime, and more informed production decisions.
We’ve spent some time in this industry convincing operators that various technologies add value to their operations. The value of increasing production and/or reducing costs, with a big, overused word called “optimization.”
Technology purveyors seem to frequently tout the features and benefits of various technologies while ignoring what potential clients are really thinking about: “What’s in it for me.”
"What's In It For Me?"
This blog focuses on a high-value application for the utilization of real-time measured bottomhole pressure (BHP) to increase the allowable volume of injected salt water to leverage existing (operator-owned) disposal assets with the full blessing of the regulator, in this case, the BCER. What’s in it for me, you ask?
How about the fact that you don’t have to pay a third-party an expensive fee to dispose of your salt water, nor do you have to drill, complete, and stimulate a new well, call it deferred capital cost. As an operator, if you don’t have take-away capacity for saltwater, you become injection-limited, which can result in a de facto production cap…ouch!
Solution:
It’s much better to take action to increase your company’s capacity to inject water locally in your own disposal operations, thereby greatly reducing costs. Leveraging existing assets eliminates or reduces the costs of third-party trucking and disposal, or the even greater capital expense of converting existing wells or drilling new ones to increase capacity.
This is exactly what transpired with a mid-tier Montney operator who wanted to investigate the difference between using SWHIP (surface wellhead injection pressure) and actual downhole real-time measurement of BHP (bottomhole pressure) to calculate disposal volume limits. What started as a project to understand dispersion (and directionality) in a horizontal disposal well turned into a project that demonstrated a substantially higher return on investment.
Tailored Solutions for Every Challenge
A horizontal Altarez disposal well was equipped with five gauges installed along the lateral section, positioned just above the Baldonnel injection zone (see below). Once injection began, the pressure responses recorded by the gauges confirmed that the injectant remained contained within the designated disposal zone — a significant achievement in an area characterized by multiple fracture networks.
The measured bottomhole pressure data demonstrated containment, but it also led the operator to believe that the existing injection limits may be too conservative for this injection well. Without going deep in the weeds, technically, multiple ensuing analyses demonstrated that there was, in fact, an opportunity to increase injection rates and volumes. The next step was to convince the BCER of the same. Sometime in 2024, the disposal application (increase) was granted.
What was in it for the operator? Let’s get to the numbers.
- Operator’s application to increase average MWIP from 2-4 Mpa to 8.7 Mpa was accepted by the regulator
- This allowed for an increase in injection volume of up to 650 m3/day
- ROI = Cost of using a third party trucking/disposal company at $113/m3 = $73,450/day or $14.7M/year (200 days)
- Payout on multi-point casing conveyed real-time gauge system = 5 days
- Cost to drill and complete a new disposal well (including gauges) = $2.5M. Payout = 34 days
We have seen a great many “returns on investment” with exceptional technical people who did not accept the status quo, who had a vision for doing things differently, and proved it with dynamic real-time measurement of bottomhole pressure. This is but one example.
The Reservoir is Talking; We Only Need to Listen. That’s What’s in It For You!

Why Choose GEO PSI?
With over 17,000 successful installations worldwide, GEO PSI is a proven partner for companies seeking efficiency, reliability, and innovation in their operations. Our vertically integrated approach ensures that customers benefit from the highest standards of quality, from design through to delivery.
By choosing GEO PSI, you gain access to:
- Streamlined Solutions: A one-stop shop for all your downhole monitoring needs, simplifying procurement and project management.
- Innovation: Our advanced products and technologies are designed to enhance operational efficiency, reduce costs, and improve long-term performance.
- Customer-Centric Approach: Our focus is on delivering value to our customers, helping them achieve their production goals more efficiently and sustainably.















![[Whitepaper] The Inherent Value of Permanent Downhole Gauges GEO PSI Hero](https://www.geopsi.com/wp-content/uploads/2024/08/The-Inherent-Value-of-Permanent-Downhole-Gauges-300x150.jpg)