Tag: vibration monitoring

SPE-Blog-Post-Background-GEO-PSI
Artificial Lift
Jeff Scott

GEO PSI at SPE Santa Maria 2019

“ROI from Real Time Downhole Instrumentation EOR: Steam Injection and Waterflood Applications You Can’t Manage What You Don’t Measure” – By John Sullivan and Jeff Scott, GEO PSI GEO PSI has been invited to present at the SPE Santa Maria September Meeting And Networking Event!

Read More »
Solutions-Reservoir-Surveillance-Applications-Free-Analysis-GEO-PSI
Archive
Jeff Scott

Downhole Gauges: Analog vs. Digital Compared

Downhole Piezo-Resistive Pressure Tools At GEO PSI we manufacture downhole instrumentation sensors which are sold in many different markets across the world. We sell both analog 4-20 mA downhole pressure tools and several types of digital tools. Both analog tools and digital tools utilize the same

Read More »
Solutions-High-Temperature-Applications-SAGD-GEO-PSI
Archive
Jeff Scott

Artificial Lift Telemetry Innovation

A New Technology in Real Time Downhole Vibration, Pressure, and Temperature Measurement for Artificial Lift Systems Our Breakthrough In Downhole Telemetry Our R&D engineering group at GEO PSI has developed a new robust downhole telemetry for our permanent downhole tools that greatly improves the speed, quantity,

Read More »
More-Articles-Icon-Two-Documents-Blog-News-GEO-PSI

More Articles

GEO-PSI-Measures-Pressure-In-Worlds-Toughest-Wellbore-Condition​-Blog-Photo-CP105-SRO
Case Study
Jeff Scott

Pressure Monitoring in Extreme Wellbore Conditions

100% Reliability For Corrosive Frac Water Source Wells Energy companies in the Permian Basin are spending hundreds of millions of dollars per day in order to supply water for hydraulic fracturing operations. Rather than purchase water from municipalities, many energy companies pump water from underground aquifers. Most common are the Capitan Reef, and the Dockum

Read More »
Using-Real-Time-Data-to-Overcome-Deferred-or-Lost-Production-GEO-PSI
Artificial Lift
Aastik Saluja

Cut Deferred & Lost Production with Downhole Data

Downhole monitoring in SRP/PCP/ESP installations to help take pre-emptive measures to reduce downtime. The Issue Globally, the oil & gas industry routinely suffers an average of 5 to 7% of unplanned downtime due to unknown wellbore problems and poor maintenance practices. However, this number is skewed due to a majority of wells with smooth &

Read More »
Solutions-Artificial-Lift-Applications-Jet-Pump-GEO-PSI
Archive
Jeff Scott

Measuring Pump Intake Pressure Downhole

Until now, there has not been a cost effective and reliable solution available for real time pump intake pressure monitoring sensors for the land based oil and gas completion market. Many cost effective systems that are being marketed to O&G customers were originally engineered for water wells. These products are not engineered with consideration of

Read More »

Want to be the first to know? Subscribe to our Newsletter!

Enter your email below and we will send you our latest content directly to your inbox. Be the first to read about topical discussions, and new product releases.